BEFORE

This maple reface consisted of the following:


Removal of cabinets over peninsula

Opening upper drawer openings to 5 inches for installation of larger drawers

Application of 1/8 inch plywood veneer

Installation of new doors, drawers, drawer fronts, crown molding and scribe.

Installation of new counter tops, sink and appliances.

AFTER